Every number I publish should trace to a captured run: the exact command, the raw output, and the hardware it ran on. This page is built from those records across my public repos. Runs captured on a laptop are labeled; they are sanity checks, not figures to cite.
The same data is available as JSON at /claims.json for tools and agents.
Captured runs
- 2026-11-13-1729-zonevex-commits-by-month
Apple M4, 10 logical cores · Darwin 25.6.0 arm64 · commit4531f13 (uncommitted changes) - 2026-11-13-1729-zonevex-october-commits
Apple M4, 10 logical cores · Darwin 25.6.0 arm64 · commit4531f13 (uncommitted changes) - 2026-11-13-1729-zonevex-repo-stats
Apple M4, 10 logical cores · Darwin 25.6.0 arm64 · commit4531f13 - 2026-10-04-1729-asof-join-vs-polars-pandas
Apple M4, 10 logical cores · Darwin 25.6.0 arm64 · commit0df6f05 - 2026-10-30-1412-asof-join-spread
Apple M4, 10 logical cores · Darwin 25.6.0 arm64 · commitfe67b08 - 2026-10-30-1423-asof-join-march-build-3c7486a
Apple M4, 10 logical cores · Darwin 25.6.0 arm64 · commitfdc202b
Claims in published writing
- First commit 2026-02-21; last commit before the pause 2026-10-22, on the same main branch
Evidence: results/2026-11-13-1729-zonevex-repo-stats/output.log. The repository is private - 25 blog HTML files in the landing site's blog folder of the Zonevex repository
Evidence: results/2026-11-13-1729-zonevex-repo-stats/output.log. The repository is private - Commits on the Zonevex main branch per month in 2026: February 148, March 199, April 44, May 338, June 100, July 0, August 0, September 0, October 7. They sum to 836. November's commits record the pause and are excluded
Evidence: results/2026-11-13-1729-zonevex-commits-by-month/output.log (command in cmd.txt, hardware in env.txt: Apple M4, 10 cores, 32 GB). The repository is private - The seven October 2026 commits all fall between 2026-10-20 and 2026-10-22: removing prices from the landing pages and the web app, excluding internal files from site deploys, correcting claims in a HyperQ post, adding a PJM large-load post, fixing the web deploy workflow, adding a specification for an open interconnection rules register, and adding engineering-journal scaffolding
Evidence: results/2026-11-13-1729-zonevex-october-commits/output.log (commit subjects). The repository is private - 2,454 cold emails sent; one person replied and said they did not need the product; one call was booked through Cal.com with a founder in the site-control field. Free calculator and toolkit downloads were few and came mostly from private equity firms
Evidence: My own figures. I have not published an export from the email-sending tool or the Cal.com booking - About 150 hours of my time and $185 in cash to build and run Zonevex
Evidence: My own estimate. I kept no timesheet or receipt export for it - 811 generation projects applied to PJM's first Cycle 1 under the reformed process; the application window closed on 2026-04-27; the process requires proof of site control
Evidence: PJM Interconnection news release 'Over 800 New Generation Projects Seek To Connect Under PJM's Reformed Process', 2026-04-29, pages 1 to 2, accessed 2026-11-13. Archived 2026-07-03 at web.archive.org/web/20260703040154/https://www.pjm.com/-/media/DotCom/about-pjm/newsroom/2026-releases/20260429-over-800-new-generation-projects-seek-to-connect-under-pjms-reformed-process.pdf - PJM said it is using HyperQ, an AI-enabled tool developed by Google's Tapestry, to help review large volumes of application data, and that HyperQ is already helping with these reviews
Evidence: Same PJM release, page 1, accessed 2026-11-13. Same archived copy - Tapestry says HyperQ evaluates each bundled agreement against four OATT site-control elements: term, conveyance, exclusivity and minimum acreage. This is vendor-reported
Evidence: Tapestry, 'Field notes: HyperQ deployment in PJM's Cycle 1', tapestryenergy.com/en/projects/field-notes-hyperq-deployment-in-pjm-s-cycle-1, entries dated 2025-12-08 to 2026-11-10, accessed 2026-11-13. Archived 2026-10-21, before the 2026-11-10 entry, at web.archive.org/web/20261021195727/https://www.tapestryenergy.com/en/projects/field-notes-hyperq-deployment-in-pjm-s-cycle-1 - Tapestry's page states that 'PJM experts retained full control over all final determinations'. This is vendor-reported
Evidence: Same Tapestry page, footnote to the 2026-04-29 entry, accessed 2026-11-13. Same archived copy - Tapestry's page does not say developers can use HyperQ today. It lists developer pre-submission access as a future item with no date. This is vendor-reported
Evidence: Same Tapestry page, 'Looking ahead' section, as of the entry dated 2026-11-10, checked 2026-11-13. A claim about what a page does not say can change; the archived copy predates the 2026-11-10 entry